This gap was about one minute and had been identified as a potential safety problem which could cause core overheating. Three such tests had previously been conducted since 1982 but had failed to provide a solution. Unfortunately, on this fourth occasion, the test had been delayed by ten hours and the reactor operating shift that had specifically prepared for the test procedure was replaced by the next shift.